| | BANGUNAN TAMBAHAN RTB - PEMBINAAN BLOK OPERASI PENYIARAN DAN DEWAN SERBAGUNA STUDIO DI KOMPLEKS PENYIARAN RTB SUNGAI AKAR - DESIGN AND BUILD
| 15HB JANUARI 2025 DAN 22HB JANUARI 2025 | 13/05/2025 | JKR/DTS/44/CQS/2024-T/VI | |
| | PERKHIDMATAN PERUNDING KEJURUTERAAN AWAM DAN STRUKTUR BAGI KAJIAN AWAL UNTUK PROJEK PERLINDUNGAN PANTAI.
| 05hb Mac 2025 dan 12hb Mac 2025 | 27/05/2025 | JKR/RFQ/DDS/09/2025 | |
| | PENAIKTARAFAN SISTEM SALIRAN DI HILIR TADAHAN BALAI KHAZANAH ISLAM SULTAN HAJI HASSANAL BOLKIAH
| 12HB MAC 2025 & 19HB MAC 2025 | 20/05/2025 | JKR/DDS 010/2025-(CDE).T.IV | |
| | KERJA-KERJA MENAIKTARAF SALIRAN DI SUNGAI TEMBURONG FASA 1
| 26HB MAC 2025 DAN 02HB APRIL 2025 | 10/06/2025 | JKR/DDS 013/2025-(CDE).T.V | |
| | REQUEST FOR QUOTATION (RFQ) - PERKHIDMATAN PERUNDING BAGI PELAN INDUK SANITASI DAN PEMBETUNGAN BAGI NEGARA BRUNEI DARUSSALAM
| 26HB MAC 2025 DAN 02HB APRIL 2025 | 20/05/2025 | JKR/RFQ/DDS/10/2025 | |
| | ROAD CIRCULATION, DROP OFF / PICK UP AREA DAN LETAK KERETA SEKOLAH RENDAH ABDUL RASHID TANJONG MAYA, DAERAH TUTONG
| 09HB APRIL 2025 DAN 16HB APRIL 2025 | 13/05/2025 | JKR/DOR/SRC 06/2025 | |
| | KONTRAK PENGGAL BAGI OPERASI DAN KERJA-KERJA PEMELIHARAAN SISTEM HAWA DINGIN BAGI BANGUNAN IBU PEJABAT, JABATAN KERJA RAYA UNTUK TEMPOH (2) TAHUN
| 16HB APRIL 2025 DAN 23HB APRIL 2025 | 13/05/2025 | JKR/DME/BOP-ACM/10/2025 | |
| | KERJA-KERJA PEMINDAHAN KABEL ELEKTRIK, HV DAN LV DI SPG 421, KG SUBOK.
| 09HB APRIL 2025 DAN 16HB APRIL 2025 | 13/05/2025 | JKR/DDS 014/2025-(CDE).T.II | |
| | REQUEST FOR QUOTATION (RFQ) CIVIL AND STRUCTURAL ENGINEERING CONSULTANCY SERVICES FOR BRUNEI DARUSSALAM DRAINANGE MASTER PLAN, SG BELAIT AND TEMBURONG FLOODPLAIN MANAGEMENT STUDIES.
| 09HB APRIL 2025 DAN 16HB APRIL 2025 | 10/06/2025 | JKR/RFQ/DDS/11/2025 | |
| | KERJA-KERJA PENGGANTIAN PERALATAN HAWA DINGIN DI BANGUNAN IBU PEJABAT, JABATAN KESELAMATAN DALAM NEGERI, JALAN UTAMA MENTIRI
| 23hb April 2025 dan 30hb April 2025 | 27/05/2025 | JKR/DME/BOP-ACM/11/2025 | |
| | MENAIKTARAF JAMBATAN (BESI KE KONKRIT) - PAKEJ 3: PEMBINAAN
| | 13/05/2025 | JKR/DOR/BBA 02/2025 | |
| | PENYAMBUNGAN PAIP PEMBENTUNGAN BAGI KAWASAN LUMUT FASA 2
| 16hb April 2025 dan 23hb April 2025 | 03/06/2025 | JKR/DDS/ 015/2025 - (SEW).T.IV | |
| | KONTREK PENGGAL BAGI KERJA-KERJA PENAMBAHBAIKAN SALIRAN BERSEPADU, NEGARA BRUNEI DARUSSALAM
| 16hb April 2025 dan 23hb April 2025 | 17/06/2025 | JKR/DDS 016/2025 - (CDE).T.V | |
| | PENGALIRAN AIR-MEMBINA STESEN PAM DI SALURAN KELUAR (OUTFALLS), JALAN MAULANA, KUALA BELAIT. (DESIGN AND BUILD)
| 09HB APRIL 2025 DAN 16HB APRIL 2025 | 20/05/2025 | JKR/DBSKB/007/2025 | |
| | PENGALIRAN AIR - MEMBINA STESEN PAM SALIRAN DI F17, SERIA. (DESIGN AND BUILD)
| 07HB MEI 2025 DAN 14HB MEI 2025 | 17/06/2025 | JKR/DBSKB/006/2025 | |
| | MENAIKTARAF LOJI RAWATAN KUMBAHAN LOS TANJONG, KUALA BELAIT
| 23hb April 2025 dan 30hb April 2025 | 24/06/2025 | JKR/DDS 017/2025 - (SEW).T.IV | |
| | KERJA-KERJA MEMBAIKPULIH STRUKTUR BESI BAGI TANGKI AIR SENTOSA
| 23hb April 2025 dan 30hb April 2025 | 27/05/2025 | JKR/DTS/06/STE/2025-T/II | |
| | 'STRUCTURAL INTEGRITY'BAGI BANGUNAN DI KAWASAN PERUMAHAN BALAI POLIS BERAKAS (BLOK G DAN BLOK H)
| 23hb April 2025 dan 30hb April 2025 | 27/05/2025 | JKR/DTS/07/STE/2025-T/II | |
| | PEMBINAAN MASJID BAHARU RANCANGAN PERUMAHAN NEGARA KAMPONG LUMUT - SUPPLY AND INSTALLATION OF DOME AND WINDOWS
| 16hb April 2025 dan 23hb April 2025 | 13/05/2025 | JKR/DOD/1/2025 | |
| | PROJEK PENGUBAHSUAIAN FLAT PERUMAHAN KERAJAAN F8, JALAN LAPANGAN TERBANG LAMA, BERAKAS (JKR NO.1465) (RETENDER)
| 16hb April 2025 dan 23hb April 2025 | 13/05/2025 | JKR/DBSBM004/2025 | |
| | MENILAI KONDISI STRUKTUR JAMBATAN
| 30HB APRIL 2025 DAN 07HB MEI 2025 | 27/05/2025 | JKR/DOR/BBA 08/2025 | |
| | KERJA-KERJA PEMOTONGAN DAN PENCANTASAN POKOK UNTUK DAERAH BRUNEI MUARA, NEGARA BRUNEI DARUSSALAM BAGI TEMPOH TIGA (3) TAHUN (FSOR) - ZON C
| 30HB APRIL 2025 DAN 05HB MEI 2025 | 27/05/2025 | JASTRE/BL/T008/2025 | |
| | MEMBAIKPULIH JALAN DAN TAMBAK DI SEPANJANG JALAN TEMADA
| 30HB APRIL 2025 DAN 07HB MEI 2025 | 27/05/2025 | JKR/DOR/SRM 07/2025 | |
| | KERJA-KERJA PEMELIHARAAN DIPEKAN MUARA (TERMASUK ROUNDABOUT PEKAN MUARA), NEGARA BRUNEI DARUSSALAM UNTUK TEMPOH TIGA (3) TAHUN
| 30HB APRIL 2025 DAN 05HB MEI 2025 | 27/05/2025 | JASTRE/BL/T007/2025 | |
| | KERJA-KERJA PEMBAIKAN DI BANGUNAN LOJI RAWATAN KUMBAHAN LOS TANJONG, KUALA BELAIT
| 23hb April 2025 dan 30hb April 2025 | 20/05/2025 | JKR/DBSKB/010/2025 | |
| | PERKHIDMATAN KUTIPAN DAN PEMBUANGAN SAMPAH DARIPADA PUSAT-PUSAT PENGUMPULAN SAMPAH DI DAERAH BRUNEI-MUARA BAGI TEMPOH LIMA (5) TAHUN
| 05HB MEI 2025 DAN 12HB MEI 2025 | 03/06/2025 | JASTRE/BKP/T009/2025 | |
| | TAMBAHAN (EXTENSION) BANGUNAN MUZIUM ALAT KEBESARAN DIRAJA BAGI PENEMPATAN USONGAN JUBLI EMAS
| 20hb November 2024 dan 27hb November 2024 | 27/05/2025 | JKR/DTS/41/CQS/2024-T/VI | |
| | PERMOHONAN DAN BANTUAN PENILAIAN MENGENAI DENGAN KEROSAKAN STRUKTUR RASUK DAN TIANG KONKRIT JHEU271 / JKR715 UNIT NO. 1 BLOK B KAWASAN SEKOLAH UGAMA PAP MUTAWAKILLAH HAYATUL BOLKIAH SERUSOP
| 23hb April 2025 dan 30hb April 2025 | 27/05/2025 | JKR/DTS/08/STE/2025-T/II | |
| | REQUEST FOR QUOTATION (RFQ) FOR ARCHITECT CONSULTANCY SERVICES FOR "KAMPUS KEKAL POLITEKNIK BRUNEI"
| 30HB APRIL 2025 DAN 07HB MEI 2025 | 03/06/2025 | JKR/RFQ/DOD/12/2025 | |
| | REQUEST FOR QUOTATION (RFQ) FOR CIVIL AND STRUCTUTAL ENGINEERING CONSULTANCY SERVICES FOR "KAMPUS KEKAL POLITEKNIK BRUNEI"
| 30HB APRIL 2025 DAN 07HB MEI 2025 | 03/06/2025 | JKR/RFQ/DOD/13/2025 | |